Borehole Truck Mounted 300 Meters Water Well Drilling Rig Equipment

The drilling depth can be configured with different accessories according to your needs to reach the drilling depth you need, which is convenient for movement and transportation and suitable for loosening soft soil layers and hard rock layers

Drilling depth

100m,200m,300m,400m,500m,600m

Maximum opening diameter

300mm / 200mm /150mm / 75mm

Movement method

Can be moved by traction

Details About Borehole Truck Mounted 300 Meters Water Well Drilling Rig Equipment

Borehole Truck Mounted 300 Meters Water Well Drilling Rig Equipment

 

Parameter

 

WQ300-TM

Total weight (T) 13
Applicable drilling diameter (mm) 140-325
Drilling depth (m) 300
Single push length (m) 3.3
Traveling speed (km/h) 80
Drill engine power (KW) 92
Working air pressure (Mpa) 1.7-3.0
Gas consumption (m ³/ Min) 18-35
Applicable drill pipe diameter (mm) 89  102
Drill pipe length (m) 3
Lifting force (T) 18
Rotation speed (rpm) 45-70
Rotating torque (N.m) 5700-7500
Vehicle mounted dongfeng motor
Automotive engine power (KW) Cummins engine 118
Driving form 4×2
Vehicle carrying capacity Front axle 3.5 tons Rear axle 9 tons
Tire Size 9.00R20
Steering wheel Right-handed
mud pump BW250-4
Overall dimensions (mm) 8500×2400×3300

 

Support customization to meet different depths and demand parameters for customization

FAQ

Q: Whafs your warranty period?
A: 12 months from winches accepted.

Q: What are the terms of payments?
A: We accept T/T, Western Union, Paypal, and cash.

Q: How long is your delivery time?
A: Generally it is 3-5 days if the goods are in stock, or it is 10-15 days if the goods are not in stock, it is according to quantity.

Q: What kind of shipment ways are available?
A4: By sea to your nearest port.
By air to your nearest airport.

Share Borehole Truck Mounted 300 Meters Water Well Drilling Rig Equipment With Your Clients

Share To Facebook
Share To Twitter
Share To LinkedIn
Share To Reddit

Send Your Inquiry Today

Big Discount

Contact ASAP